Cinco Ranch Bathrooms Laid Out Around the People Who Use Them
Plenty of Cinco Ranch bathrooms still have the garden tub, the one long vanity and the weak fan they were built with. A custom remodel starts with who uses the room every morning and works back to where the plumbing can go on a slab. Tile and fixtures come last, after the walls are open and we know what is behind them.

Veteran BuiltCinco Ranch, Texas
Remodeling a bath where there is no city hall
Cinco Ranch is unincorporated, so a bathroom remodel here has no city building permit behind it. Most of the community lies in Fort Bend County and a slice lies in Harris County, and the county your lot falls in decides whose floodplain, septic and driveway rules, if any, reach the job. State rules apply on both sides of the line. We read the rules for your parcel before the scope is final.
Gulf Coast air stays damp for much of the year, and a bathroom is where that shows first: paint peeling over the shower, mildew in the grout, a mirror that never clears. Some fans from those years are undersized, and some vent into the attic instead of outdoors. We match the new fan to the size of the room and duct it all the way out, through the roof or a side wall, with the cap sealed against summer rain.
Houses here date from 1991 onward, so a primary bath may be decades into its first set of tile. While it is out of service, most families shift to the hall bath. If the house has only one shower that works, tell us at the first visit, and we will stage the job so that shower is down for as few days as we can manage. The dumpster goes where it keeps the street clear for the neighbors.
Demolition is where a bathroom shows its history. Behind old tile we look for wallboard that went soft, dark staining on the studs and, in an upstairs bath, a toilet flange sitting on subfloor that has rotted from a slow leak at the wax ring. Under the vanity, the cabinet floor is often swollen from years of drips. Each of those gets photographed and written up as its own line, and you approve the repair before anything new goes over it.
A downstairs bath sits on the slab, so moving the toilet, the shower drain or a sink means cutting concrete. A shower that replaces a garden tub usually needs its drain somewhere new, and a toilet moved into its own small room needs a fresh line back to the main. Upstairs, the pipes run through the floor framing, which is easier to reach but has joists to work around. We mark every move at the first walk so you know which ones involve a saw.
Planning for the years ahead does not have to make the room look clinical. While the walls are open, blocking goes in behind the shower and beside the toilet so a grab bar can go up the day it is needed. A shower with a low curb or none, a built-in bench, a handheld head on a slide bar and a vanity at a comfortable height all read as good design. When a veteran needs more than that, Geoff has done this kind of accessibility work for veterans, and we plan it around the person.
If the layout works and only the tile and faucets look dated, a renovation in the same footprint keeps the slab whole and the job shorter.
Is a custom layout worth it for your bath?
Moving fixtures pays off when the room works against you every day, and it is money wasted when the layout is fine and only the finishes are worn.
- The garden tub fills a corner nobody has bathed in for years, and the shower beside it is too small to turn around in comfortably.
- Two people get ready in the room at the same time and spend the morning trading one sink, one mirror and one drawer.
- Someone at home is getting older or coming back from an injury, and stepping over the tub wall has turned from a nuisance into a risk.
- The floor feels soft near the toilet or the tile around the tub sounds hollow, so the walls and floor are coming out regardless.
And when it does not
- If the garden tub is the one spot where someone in the house unwinds at night, keep it and put the money into the shower and storage.
- A slow drain, a running toilet or a cracked grout line is a repair, not a remodel, and Leland will tell you so on the phone.
- If the house has one bathroom and nowhere else to shower, a full layout change may need to wait until a second bath is up and working.
How a custom bath comes together
- I
Listen, measure, mark
We start with how the room gets used: who, when, and what they keep in it. Then we measure, find the drains and the main line, check where the fan vents, and tape the new layout on the floor. The written scope lists every fixture that moves and every slab cut.
- II
Demo and open up
Dust walls go up, the hall floor gets covered, and the old vanity, tub, tile and wallboard come out. Whatever the walls were hiding is photographed that same day, and any added repair waits for your okay before work goes on.
- III
Rough-in and waterproofing
Drains and supply lines go to their new spots, the slab is patched once the pipe is tested, blocking goes in for grab bars and the fan gets ducted outdoors. Backer board and a waterproof membrane follow, and the shower pan gets a flood test before any tile goes down.
- IV
Tile, fixtures and the final walk
Tile, vanity, toilet, lighting and hardware go in, and the glass is measured after the tile is set. We walk the room with you, run every faucet, flush the toilet and leave the fan running with the door shut.
What we ask before writing the scope
- Who uses this bathroom, and at what time of day?
- Does anyone still use the garden tub?
- Is anyone in the house planning to stay here as they get older?
- What sits on the counter now because it has nowhere else to go?
- Is the bath upstairs, or downstairs on the slab?
Can you turn our garden tub corner into a larger shower?
Yes, and it is a common request in houses from this era. The tub and its platform come out, the drain moves to suit the new shower floor, and the corner becomes a walk-in shower, often with a bench. On a slab that includes a saw cut, which shows up as its own line in the written scope.
What happens if you find rot or an old leak behind the walls?
We stop, photograph it and show you in person. Rotted subfloor at a toilet, soft studs behind a shower or a slow drip under the vanity each get written up with the fix. Nothing new goes over damage, and nothing gets added to the job until you have said yes to it.
Can a curbless shower go in on a slab?
Usually. A curbless shower needs its floor to sit lower than the bathroom floor around it, so on a slab the concrete in the shower area is cut and recessed to make room for the slope. It is more work than a shower with a curb, which is why we settle it before demolition.
How high should the new vanity be?
Often higher than the one that came with the house. Many newer cabinets sit closer to kitchen counter height, which saves bending over the sink. We have you stand at a counter at home and pick the height that feels right, and when two people share the room, the two sinks can sit at different heights.
Will a new exhaust fan really stop the mildew?
It goes a long way if it is sized for the room, vented all the way outdoors and left running long enough after each shower. A timer or humidity switch keeps it going after you leave. Mildew that grew from a leak rather than steam needs the leak fixed, which is why we look behind the walls first.
Does my association need to approve a bathroom remodel?
Architectural review usually looks at exterior changes, so most interior work is outside it. If the job adds a window, puts a vent cap where the street can see it or keeps a dumpster out front for a while, ask your association first. We give you whatever product details they want to see.
Two veteran owners, and one of them walks your bath
Leland Cannon retired from the Army as a First Sergeant in 2018 after more than twenty years, and his is the voice on (832) 364-6271. Geoff Schardien served in Air Force Security Forces and brings more than twenty years of residential construction, including accessibility work for veterans. Veteran Built works out of Cypress, and an owner walks every bathroom before a scope is written.
While the studs are bare, one of the owners comes out to look at the framing, the blocking and the membrane before tile covers them. When demolition turns up a problem the scope never counted on, he shows it to you on site and talks it through face to face. And if your bathroom only needs a repair, that is exactly what he will tell you.